1. PSI Safety Gate
Default checked items follow the current field PSI example. Inspector may add/remove checks if site condition changes.
Task Steps / Hazard / Control
Longer notes can be entered here. Add another row if the field condition requires more detail.
Task Step
Hazard
Control
Task Step
Hazard
Control
Task Step
Hazard
Control
+ Add Task / Hazard / Control Note
CONFIRM SAFE & OPEN CHECKLIST →
2. Unit Details / Location Reference
FIELD MANUAL ENTRY MATRIX:
Asset Type Escalator Moving Walkway Unknown / Field Confirm
Key in the Box YES NO N/A
Key / Start-Stop Test Notes
Trigger Proximity Scan
GPS/GNSS Location Reference: Awaiting location reference...
Active Sync Location: Sector: Unmapped Reference Address
3. Initial Status Selection
OPERATION
OUT OF SERVICE
⚠️ OUT OF SERVICE REMARKS PROFILE
Is there an existing Maintenance Sticker or Barricade present?
NO (New Incident - Document Fault)
YES (Pre-existing - Maintenance Aware - No Action Required)
Existing maintenance markers confirmed. Checklist can be bypassed for this asset.
SAVE OOS MAINTENANCE RECORD
4. Field Inspection Walk-By Matrix
⚠️ STANDBY: Total verification incomplete. All inspection items across Entrance, Exit, and General sections must be evaluated before committing the record.
Commit Inspection Verification Log
5. Historical Session Verification Records & Reports [SYS_INIT] Core Engine Layer Active... Ready for Manual Target Reference Mapping.
Saved Sessions: 0 · Latest: none
Delete Last Saved Record
📥 Export Data Log (.CSV)
Clear Saved Test Data
6. Generate Reports
Report Type
Weekly Hard Copy Report Package — All Assets
Incident / Remarks Report — All Assets
Full Hard Copy Report Package — All Assets
Single Asset Weekly Report
Asset Scope
All inspected assets
Current selected / last asset only
Selected building only
Building
All
DTB
ITB
Incident Filter
Incident / FAIL / OOS only
Out of Service / Maintenance-aware only
FAIL checklist items only
All committed records
Report Date Filter
All saved records
Current week
Custom date range
Week Columns
Start from Monday
Custom Start Date
Custom End Date
Generate Selected Report